FK Lowry delivers Glasgow CFA Project

Client
Robertson
Value
£300 K
Duration
3 Weeks

FK Lowry have successfully completed a CFA Piling Project in City Centre Glasgow. FK Lowry Piling undertook the Design and Installation of CFA Bearing Piles for their existing client, Principal Contractor, Robertson. FK Lowry were sub-contracted to install 131 No. 450mm dia. CFA Bearing Piles utilising their Soilmec SR-95 Piling Rig over a 3 week programme.

FK Lowry’s Business Development Manager, Mark McKeown explains;

We’re delighted to have successfully delivered another project for our existing client, Robertson. It comes on the back of recently delivered Roberston projects at Springside, Edinburgh and Grangemouth. 450mm Dia. CFA Piles were installed to depths of up to 16m for axial vertical loads of up to 950kN using our most powerful high torque Soilmec SR-95 CFA Piling Rig. The site is located just over 100m from the River Clyde and adjacent to the Glasgow High Court of Justiciary. Ground conditions could be described as Made Ground overlying Medium Dense Sand with the Pile Design verified with 2 No. Static Load Tests and 100% Integrity Testing. We were delighted with the way the project was delivered and look forward to continuing our relationship with our key client across Scotland.
Mark McKeown, Business Development Manager
Fklowry piling cfa glasgow
Glasgow cfa pile fklowry
Your browser is out-of-date!

Update your browser to view this website correctly. Update my browser now

×