
This project saw the creation of a new production plant, utility and administration buildings at IDX, Wexford.
The €1.5 million contract ran for three months as a mixed piling scheme involving the installation of some 232no 450mm diameter CFA piles and 1,225no 270mm precast concrete piles using two PM20 piling rigs and a CM48 rig.