Our work package included;
- 170m of Runway day joint saw cut and sealing
- 190m of Runway Maxiflex joint repair
- 20m of Runway Maxicrete patch repair
Working exclusively on night time limited possession periods, we worked collaboratively with our Client to ensure that Airport Operational Certainty was maintained at all times.
Client testimonial – Rob O’Dare Airfield Technical & Compliance Manager
Bristol Airport has a long standing relationship with Lagan Airport Maintenance Ltd and have completed many projects together over many years.
LAML’s helpful and flexible approach to both the planning and execution of the recent runway maintenance package ensured the works were completed to an extremely high standard, on time and on budget with practically zero operational impact.
I would have no hesitation in recommending LAML for work of this nature anywhere where excellent value, high quality work is required in high risk operational landscapes.